亚洲国产精品自在在线观看|久久亚洲国产精品五月天婷婷|狠狠狠久久久免费观看|欧美激情中文字幕精品自拍

<address id="hwnm6"><var id="hwnm6"></var></address>

<dfn id="hwnm6"></dfn>
    1. <style id="hwnm6"><ul id="hwnm6"></ul></style>
      <pre id="hwnm6"><tt id="hwnm6"><th id="hwnm6"></th></tt></pre>

    2. China's first tidal power unit connected to grid for one year

      Source: Xinhua| 2018-06-01 16:15:41|Editor: Li Xia
      Video PlayerClose

      HANGZHOU, June 1 (Xinhua) -- China's first tidal power station has been connected to the grid for a year, the longest stable use of the renewable energy, according to the developer.

      The 3.4 mega-watt generating unit built by Hangzhou Lin Dong Ocean Energy Technology Co. Ltd. in Zhoushan City, east China's Zhejiang Province, has sent over 800,000 kilowatt hours of electricity to the grid.

      Lin Dong, chief engineer and chair of the company, said on Thursday that when all turbines of the generating unit are installed in November, it will have an annual power output of 6 million kilowatt hours, enough for supplying electricity for 3,000 households annually.

      The previous record of tidal energy power generation was set in Britain with a four-month supply in 2015.

      He said the company is aiming at building a 15 mega-watt or 20 mega-watt power unit that can break even the cost, making the sustainable energy feasible.

      Lin is expecting foreign orders, with representatives from Canada and New Zealand interested.

      TOP STORIES
      EDITOR’S CHOICE
      MOST VIEWED
      EXPLORE XINHUANET
      010020070750000000000000011100001372231461